Kitchen Installations

Structural work and full fit-out for kitchens that are built to last.

Overview Typical: 2–4 weeks

We handle the structural side of kitchen projects — wall removals, steel beams, first-fix plumbing and electrics — as well as full installation of units, worktops and appliances, working alongside your kitchen supplier or specifying the whole design ourselves.

How it runs

Our process.

Typically 2–4 weeks from first visit to handover. You get a named contact for the whole of it.

  1. 01

    Design consultation

    Layout, structural changes and specification agreed with you.

  2. 02

    Structural check

    Any wall removals assessed and, where needed, a steel beam installed.

  3. 03

    Strip-out

    The old kitchen is removed and the space prepared for first fix.

  4. 04

    First fix

    Plumbing and electrics positioned for the new layout.

  5. 05

    Plastering & flooring

    Walls and floor finished ready for units.

  6. 06

    Install & finish

    Units, worktops, appliances, splashback and tiling fitted.

  7. 07

    Final inspection

    Everything tested and checked before handover.