Wall and floor tiling, including wet rooms and large-format formats.

Overview Typical: 2 days – 2 weeks

Good tiling starts with proper preparation. We level and prime substrates, tank wet areas, and set out tiles so cuts land where they should — in bathrooms, kitchens, hallways and outdoor areas.

How it runs

Our process.

Typically 2 days – 2 weeks from first visit to handover. You get a named contact for the whole of it.

  1. 01

    Substrate check

    We confirm the surface is sound, level and suitable for tiling.

  2. 02

    Preparation

    Levelling, priming and tanking carried out where needed.

  3. 03

    Set out

    Tile layout planned so cuts and joints fall neatly.

  4. 04

    Fixing

    Tiles fixed with the correct adhesive for the substrate and format.

  5. 05

    Grout & seal

    Grouting, silicone and sealing completed and cleaned down.