Structural Alterations

Wall removals, steel beams and openings — engineered, installed and signed off.

Overview Typical: 1–3 weeks

Opening up a space safely means proper structural design, not guesswork. We work with structural engineers to specify beams and padstones, carry out the installation with correct propping, and see the work through building control sign-off.

How it runs

Our process.

Typically 1–3 weeks from first visit to handover. You get a named contact for the whole of it.

  1. 01

    Structural assessment

    We establish which walls are load-bearing and what is required.

  2. 02

    Engineer calculations

    A structural engineer specifies beam sizes and bearings.

  3. 03

    Building control notice

    The work is registered and inspection stages agreed.

  4. 04

    Propping & removal

    Temporary support installed before the wall is taken down.

  5. 05

    Beam installation

    Steel installed on engineered padstones and fire-protected.

  6. 06

    Making good & sign-off

    Plastering, finishing and final building control inspection.