Service

Bathroom Renovation

Full bathroom refits, from re-plumbing through to tiling and finishing.

Overview Typical: 1–3 weeks

From a straightforward suite swap to a full re-plumb with a walk-in shower, we manage every stage of a bathroom refit — waterproofing, tiling, sanitaryware and finishing — to a standard that lasts.

How it runs

Our process.

Typically 1–3 weeks from first visit to handover. You get a named contact for the whole of it.

  1. 01

    Design & selection

    We help you choose a layout and fittings that suit the space and budget.

  2. 02

    Strip-out

    The old bathroom is removed and the room prepared.

  3. 03

    First fix

    Plumbing and electrics repositioned for the new layout.

  4. 04

    Waterproofing

    Tanking applied in wet areas to prevent future leaks.

  5. 05

    Tiling

    Walls and floors tiled to a precise, level finish.

  6. 06

    Fit sanitaryware

    Bath, shower, basin and toilet installed and connected.

  7. 07

    Testing & sealing

    Everything tested for leaks and sealed before handover.

Recent bathroom renovation work.

Thinking about bathroom renovation?

Get a free, no-obligation quote from our team.